• Hernani (Gipuzkoa) / Barcelona
  • Lun-Vier: 7:00-15:30
  • 943 33 04 28

Languages


Edit Translation

Real Sociedad Stadium

Year 2019

Renovation of the Real Sociedad stadium:

The Real Sociedad football stadium, Anoeta, was renovated in 2019, making it the state Reale Arena. Cover was part of this project providing its experience in coatings using the best thermoplastic products.

The Real Sociedad stadium needed to cover the white metal structure located at the top of the building. The importance of such a coating is due to the fact that said structure is in the open. The metallic structures that are in the exterior suffer more due to the climatic changes.

In this case, the stage of the Real Sociaedad, located in the city of San Sebastián, has both climatic changes and a very humid environment. Therefore, changes in temperature, sunlight, rains, hail, etc., are aspects that can greatly deteriorate the coated structure.

Other projects related to the sector:

Within the construction sector, Cover Systems S.L has carried out more projects such as the coating of the railings of the Hotel Londres de San Sebatián.

San Sebastian - Donostia